The launch of the World’s 2nd Tallest Tower came with massive expectations tied in tight knots with challenges at every step. The event was produced by Creative Factory & Wizcraft Global along with the support of our skilled partners and team members. The highlight of the event was its creative storytelling backed by the engineering craft of a custom-built 16.5 x 4 x .5 meter ramp that was elevated by 4 motors capable of lifting 6 tons along with a 17-meter look track mounted on the ceiling. This is an event that will always be close to our hearts. Thanks to AZIZI Developments for once again trusting us.